|
Title: |
IC 3133 |
Description: |
IC 3133 waits for authority from the RTC to re-enter the Neenah Sub main at Waupaca Foundry plant 2. |
Photo Date: |
9/22/2014 Upload Date: 10/9/2014 9:55:24 PM |
Location: |
Waupaca, WI |
Author: |
Spencer Wagen |
Categories: |
|
Locomotives: |
IC 3133(GP40R) |
Views: |
84 Comments: 0 |
|
|
|
Title: |
IC 3133 |
Description: |
With a green signal displayed, IC 3133 leads train L595 off of the spur and onto the Neenah Sub main. The train will then shove backwards to pick up the conductor after he throws the switch. |
Photo Date: |
9/22/2014 Upload Date: 10/9/2014 9:56:49 PM |
Location: |
Waupaca, WI |
Author: |
Spencer Wagen |
Categories: |
|
Locomotives: |
IC 3133(GP40R) |
Views: |
76 Comments: 0 |
|
|
|
Title: |
IC 3133 |
Description: |
Switch thrown and shove move completed, the conductor climbs back aboard the IC 3133 and the train will soon depart for Neenah |
Photo Date: |
9/22/2014 Upload Date: 10/9/2014 9:57:44 PM |
Location: |
Waupaca, WI |
Author: |
Spencer Wagen |
Categories: |
Roster |
Locomotives: |
IC 3133(GP40R) |
Views: |
135 Comments: 0 |
|
|
|